Page Properties  
Text Size:
Font:
Background:
Images:
Margins:
Sponsor
 Apply current changes to added page
Help
CommandKeyboard ShortcutExplanation
UndoCtrl ZUndo the last change
RedoCtrl YRedo
IsolateIRemove everything but the current selection
RemoveDelRemove the selected elements
WidenWMake the selected element as wide as the page
ResizeZResize the selected element
Select MoreMIncrease the size of the current selection
Select LessLDecrease the size of the current selection
Hide Background Make background white and text black
Hide Images Remove all images on the page
Auto Format Automatically format page for printing
Save As PDF/HTML Save an electronic version of the modified page
Add Page Print several web pages together as one document
Save Clip Save part of the page for later (Requires free account)
Save As Change Set Save series of changes made to the page (Requires free account)
Apply Change Set Apply series of changes to the current page (Requires free account)
Page Help
Install EcoFont

This browser configuration does not currently support EcoFont. Don't worry, there are two ways you can get EcoFont working.

  • Option A: Upgrade Your Browser
    EcoFont will magically work on the most recent browsers: Firefox 3.1 (beta), Opera 10 (beta), and Safari 3.1+.
  • Option B: Install Ecofont on your system
    The font download and installation instructions are available at here When your done, come back and EcoFont will work.

About Ecofont: EcoFont is ink-saving font developed by SPRANQ. EcoFont reduces ink consumption up to 20% by putting tiny holes in letters. More info: www.ecofont.eu/ecofont_en.html
Save Change Set
Name:
Automatically apply change set:
PrintWhatYouLike Account Required
Free Trial Account: Over Quota

"Textile ERP", "textile software"... Datatex is at your service. Contact us via  e-mail,  electronic form  or call us between 9:00am and 5:00pm GMT+1 at (+39) 026797441 or search  datatex offices.

Change website's languages »    English   |   Italiano   |   Espanol   |   Deutsch   |   Chinese

  • Product portfolio - functional areas
  • =================

MCM - Machine Capacity Management


The goal of Datatex MCM - Machine Capacity Management is to support the best utilization of the capacity of a company’s plants, in order to avoid under- and/or over-utilized resources or unfulfilled customers.

Datatex MCM is a flexible graphical tool supporting single users for single facilities, or multiple departmental users for single/multiple facilities. Moreover, the Planner, if empowered, can change the Production Schedule with a specific tool.


Datatex MCM’s Objectives

MCM support the answer to the following questions:

  • Where are my capacity exceptions?
  • Where are my material exceptions?
  • Where are my delivery date problems?
  • What is the best delivery date?
  • Is it possible to accept that order for that date?

Datatex MCM Capabilities

MCM is a finite/infinite planning graphic tool, which helps the planner organizing all production
requirements considering:
  • Machines capacity and compatibility,
  • Materials (Stock, supplier orders, WorkInProgress, etc.)
  • Production constrains (Tools, human resources etc.)
  • Requested delivery dates

Datatex MCM competitive advantages

  • Designed for textile industry. It considers constraints and best-practices of the sector
  • Automatic scheduling and balancing of demands
  • Bottleneck detection in case of infinite capacity scheduling
  • Configurable according to the company’s needs and the textile industry typology

Datatex MCM functions

  • MCM places production requests on the planning board, according to pre-defined rules (Request date, compatibility between product and resource, etc)
  • A queue of the requests is sorted by user definable priorities.
  • The supported planning methods are “starting date” (earliest date – improvement of production efficiency) or “delivery date” (latest dates – stock reduction and WIP improvement), at finite capacity or at infinite capacity
  • Infinite capacity rule is to release a bottle neck by increasing capacity or moving to alternative Work Centre
  • Finite capacity rule is to delay steps, when and if needed.

Datatex MCM Additional Capabilities

The planner can:

  • Increase the capacity  of a Work Centre for a certain period
  • Decrease the capacity  of a Work Centre for a certain period
  • Switch Finite/infinite capacity method
  • Change Work center
  • Modify Calendar.

Datatex MCM Order Acceptance

With the function it is possible to check if a certain order can be accepted for a requested date and if not, what is the “best possible” delivery date based on the capacity availability.


 


  • =================
Application screenshots
  • Exchanges information
    Datatex MCM exchanges information with the company’s ERP. It can support one or many planners, for one or many departments.
  • Plan and bin
    Datatex MCM: example of the plan and bin. Load balance analysis: The system works at plant, department or work center level. It is possible to detect possible capacity bottlenecks (infinite capacity model) or to work at finite capacity.
  • Different departments
    With Datatex MCM, it is possible to see different departments. In this example we have the global view (all the departments) or every single department. Sewing, Dyeing and Finishing. It is also possible to use the labels or the numbers (1-2-3-4) to navigate from one dept. to the other. The screen is divided in 2 parts, the plan and the bin. The production requests are downloaded from the host to the bin.
  • Details of the production
    Datatex MCM can present the information with the needed details of the production (tile function). The vertical bars are user definable indicators. An indicator can be for instance how many production demands are confirmed and how many are not.
  • Finishing dept
    Datatex MCM plan example for the finishing dept. only. The first line is the summary of the 3 different stenters (1-2-3)
  • Monthly view
    Same plan with monthly view
  • The planner
    The planner can change the sequence of the bin, the workcentre capacity and its calendar. The capacity is by hours. The planner can decide to use the real capacity or want to work with overbooking or consider a capacity <100%, to take care of inefficiency.
  • Details of what is late
    With Datatex MCM the planner can see the details of what is late. It is possible in the same way, look at the lack of material or consider additional resources (different symbol).
  • Find data and information
    Datatex MCM helps the planner in finding data and information.